From clean ground area to a working robotic cell in 90 days


When most individuals consider putting in a robotic cell, they think about a course of that takes half a 12 months, possibly extra. Countless design critiques, integration delays, and operator coaching that drags on for weeks.

However it doesn’t should be that means.

With the Lean Robotics methodology, we’ve seen producers go from “we should always automate” to a totally working robotic cell in as little as 90 days. Right here’s how.

 

 

Why pace issues

Time is cash. The sooner you deploy automation, the earlier you:

  • Scale back labor bottlenecks
  • Enhance throughput
  • Seize ROI

Lengthy timelines kill momentum. They drain enthusiasm out of your staff, delay your return, and in some instances, stall the mission fully.

That’s why a structured, time-bound method is vital.


The Lean Robotics 90-day roadmap

Lean Robotics Process

Month 1 – Design 

As a substitute of beginning with the robotic, begin together with your cell’s output.

  • Outline the “buyer” on your cell (usually the following step within the course of).
  • Decide the amount, high quality, and tempo that course of wants.
  • Design your structure for circulation, security, and ease of use.

Professional tip: Keep away from overengineering. Focus solely on the options you want for this section of manufacturing. You’ll be able to at all times develop later.

Month 2 – Combine

That is the place you flip the plan into actuality:

  • Assemble your cell with standardized, pre-tested parts the place potential.
  • Program offline to avoid wasting on manufacturing downtime.
  • Check with lifelike manufacturing inputs—don’t wait till set up to find points.

Professional tip: Hold integration lean. Overcomplication at this stage results in delays and future complications.

Month 3 – Begin to function

As soon as the cell is put in, it’s time to:

  • Practice operators for confidence and luxury, not simply compliance.
  • Run at low quantity first, gathering suggestions out of your staff.
  • Optimize primarily based on real-world efficiency earlier than scaling to full output.

Professional tip: Doc the whole lot—layouts, packages, SOPs—so your subsequent cell goes in even sooner.

What you acquire by shifting quick

  • Faster ROI – You begin saving sooner.
  • Workforce buy-in – A brief, profitable deployment builds confidence for future automation.
  • Standardization – Classes out of your first 90-day mission develop into the blueprint for the following.

Lean Robotics makes it potential

The 90-day timeline is about eradicating the waste that slows initiatives down. With the precise framework, instruments, and mindset, your staff can go from clean ground area to a productive robotic cell in simply three months.

 

Wish to see how this might work in your manufacturing facility?  

👉 Take a deep dive into these ideas together with your FREE digital model of the Lean Robotics e book (or order a bodily copy!)

👉 See if a Robotiq Palletizing Resolution is an efficient match on your manufacturing facility. Merely reply a collection of questions and we’ll ship you a custom-made 3D simulation and report exhibiting precisely which resolution matches your manufacturing facility area and wishes in only a matter of minutes!

Lean Robotics Book

Robotiq Palletizing Fit Tool

 



Related Articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest Articles

PHP Code Snippets Powered By : XYZScripts.com